Location: Lakeland
Owner: Lakeland Regional Health
General Contractor: Creative Contractors, Inc.
Architect: Hunton Brady Architects
Engineer: TLC Engineering for Architecture
Year Completed: 2017
APG provided electrical construction for a new 24,000 square foot central energy plant with two 4,000A switchboards for normal power, and two 6,000A switchboards for emergency power. Ten 1,600A Automatic Transfer Switches were tied in with four new 1,500kW generators controlled by sophisticated paralleling switchgear, providing reliable power for life-saving procedure rooms for many years to come. More than 27 tons of EMT conduit was installed for this project!