by APG | Aug 9, 2024
THE SOUND BACK TO PROJECTS At the heart of Clearwater’s vibrant cultural scene, The Sound spans 4,000 square-feet and highlights APG Technology’s expertise with the installation of advanced audio-visual systems. This dynamic venue features a 4,000-seat outdoor...
by APG | Mar 17, 2023
MUSEUM OF THE AMERICAN ARTS AND CRAFTS MOVEMENT BACK TO PROJECTS APG played a crucial role in the construction of the Museum of the American Arts and Crafts Movement (MAACM) in St. Petersburg, Florida. This $70 million, 137,000 square-foot museum, which opened in...
by APG | Mar 16, 2023
RUTH ECKERD HALL MAIN LOBBY ENTRANCE RENOVATION BACK TO PROJECTS Designed and built by APG, Ruth Eckerd Hall’s Main Lobby entrance renovation gave a major overhaul to this performing arts venue. A 1,200 square-foot addition was added to the renovated 4,500...
by APG | Mar 16, 2023
TAMPA MUSEUM OF ART BACK TO PROJECTS A landmark in the downtown area, the Tampa Museum of Art brilliantly lights up the Hillsborough River with its color-changing fiber-optic facade lighting. APG is proud to have been part of the construction team for this attraction,...
by APG | Mar 16, 2023
THE JAMES MUSEUM OF WESTERN & WILDLIFE ART BACK TO PROJECTS In the heart of downtown St. Petersburg, APG contributed to this architecturally stunning, 80,000 square-foot museum, including gallery space, theater, event space, cafe, store, and administrative areas....