APG Contractors and Engineers
  • Home
  • About Us
    • Our History
    • Leadership
    • Pipeline
  • What We Do
    • Electric >
      • Preconstruction
      • Construction
      • Collaborative Delivery
    • Engineering
    • Technology >
      • Voice Data
      • Audio Visual
    • Life Safety >
      • Installations + Upgrades
      • Testing + Inspections
    • Security
    • 24/7 Service >
      • Emergency + Planned Service
      • Maintenance + Inspections
  • Our Work
    • Healthcare
    • Education
    • Public Works
    • Commercial
    • Sports + Recreation
    • Arts + Attractions
    • Mission Critical
    • Industrial
    • Senior Living
    • Energy Plant
    • Emergency Power
  • Careers
  • Contact Us
  • Employee Access
  • Home
  • About Us
    • Our History
    • Leadership
    • Pipeline
  • What We Do
    • Electric >
      • Preconstruction
      • Construction
      • Collaborative Delivery
    • Engineering
    • Technology >
      • Voice Data
      • Audio Visual
    • Life Safety >
      • Installations + Upgrades
      • Testing + Inspections
    • Security
    • 24/7 Service >
      • Emergency + Planned Service
      • Maintenance + Inspections
  • Our Work
    • Healthcare
    • Education
    • Public Works
    • Commercial
    • Sports + Recreation
    • Arts + Attractions
    • Mission Critical
    • Industrial
    • Senior Living
    • Energy Plant
    • Emergency Power
  • Careers
  • Contact Us
  • Employee Access

PROJECT SPOTLIGHT: The Opal Sol Hotel

5/1/2025

0 Comments

 
Picture
Rising along the Clearwater Beach shoreline, the newly completed Opal Sol Hotel is a stunning addition to the Gulf Coast horizon. This 15-story, 248-room luxury resort boasts spectacular waterfront views and top-tier amenities, including a pool deck terrace, nine-level parking garage, multiple restaurants, a state-of-the-art fitness center, and expansive event spaces. A pedestrian bridge connects the hotel to the nearby Opal Sands Resort, providing added convenience for guests.

The project launched before design documents were finalized, requiring our team to stay flexible and proactive throughout construction. With a tight deadline targeting Spring Break 2025, coordination was key. After recently completing the JW Marriott with the same Moss & Associates team, APG was trusted once again to deliver. We worked closely with Moss from the start, anticipating rough-ins for electrical, life safety, and technology systems while the design plans were still evolving.

In total, our team installed over 318,000 feet of raceways and 600,000 feet of wire to support the hotel’s electrical infrastructure. Our BIM group played an essential role in efficiently routing risers, laying out electrical rooms, and optimizing bus duct systems. APG Technology also delivered a turnkey system, including more than 300,000 feet of Cat-6 cable and 6,000 feet of fiber optic backbone across 18 IDF closets.

The project presented complex lighting challenges, with more than 5,000 feet of linear lighting, and a lighting control system that had to adapt to evolving fixture selections. Our team worked directly with manufacturers to stay ahead, roughing in cabling as specifications were being finalized.

Despite navigating a beachfront site with limited material storage, ongoing design changes, and even a hurricane setback, the project was completed on time. This achievement speaks to the coordination, resilience, and determination of the entire team.

Led by Senior Project Manager Anthony Ciquera and Superintendent Eric Beal, the Opal Sol Hotel reflects the craftsmanship and dedication APG brings to every project. We’re grateful to everyone who contributed to this effort and to Moss & Associates and Senior Project Manager Tyler Harper for their continued partnership.
​
Now open, the Opal Sol Hotel stands as a premier destination in Clearwater Beach and a proud addition to the area’s vibrant hospitality landscape.
Picture
Picture
Picture
Picture
Picture
Picture
0 Comments

Your comment will be posted after it is approved.


Leave a Reply.

    Categories

    All
    2017
    2018

Picture
EMPLOYEE ACCESS

© 2020 APG Electric, Inc. All Rights Reserved. | Terms of Use